teknikjobb.se

logo

Thesis project at R&D Dusty and Slurry, Construction: Dust extractor cyclone auto dump

Ort
Utgår

2019-11-21

Ansök nu

Thesis project at R&D Dusty and Slurry, Construction: Dust extractor cyclone auto dump

Are you a student within mechanical engineering and search for a thesis project? Husqvarna Group and our Construction division are searching for students to do their thesis work about "Dust extractor cyclone auto dump" at R&D Dust and Slurry.

Thesis project: Dust extractor cyclone auto dump
In order to increase uninterrupted runtime in our dust extractor systems. A way of automatically getting material out of the dust cyclones, without interrupting suction is required. Today’s extractors generally need to block off or drastically lower air flow in order to completely empty the cyclone into a bag system.


Objects:

  • Investigate if it is possible to design a robust auto dump function that can be manually & automatically controlled added to our line of dust extractors. 
  • Develop and test a prototype using Husqvarnas in house and external prototype suppliers.


The thesis include:

  • Investigate different options for how to empty out a dust extractor cyclone without losing airflow in the dust extraction system.
  • Decide which option is viable. Design & develop a prototype that can be engaged/disengaged manually and with a potential to be managed automatically. With simplicity and robustness in mind.


Reporting will be through regular meetings and written documentation in the form of a "Husqvarna design guideline" as well as the wishes of the university.
 

Proper area of education: Mechanical Engineering


How to apply
Please send in your application with CV and cover letter no later than November 21st. Start date of the thesis project is in beginning of 2020, Q1.

For questions regarding the thesis project please contact:
Jonas Eriksson, R&D Manager Dust & Slurry, jonas.eriksson@husqvarnagroup.com


What happens after you have applied?
When the application date is due, we will review your application carefully to see if your profile matches the requirements of the vacant position. If we believe you are a potential candidate for the role, you will be invited for an initial interview. In preparation for the interview you will receive information about the arrangement as well as other steps in the process, such as second interviews, assessments, references and introduction. If you aren’t chosen to proceed in the process, you will be informed of this at latest when the position has been filled.

About Construction 
Construction, a division of the Husqvarna Group, is a world leader in machinery and diamond tools for the construction and stone industries. The foundation is built on product and technology leadership ensured by high investment levels in user-focused product development to offer professional end-users the most effective and efficient solutions. Products and services are distributed globally in all relevant sales channels. In 2018 revenue was SEK 5.8 billion generating an EBIT of around 12%. In the last year the division has transformed through 4 important acquisitions.

Dela detta jobb

logo
Thesis project at R&D Dusty and Slurry, Construction: Dust extractor cyclone auto dump

Husqvarna Construction